Skip to main navigation Skip to search Skip to main content

Dual-objective Job Shop Scheduling Problem with Skilled Workers

  • Mahidol University

Research output: Chapter in Book/Report/Conference proceeding › Conference contribution › peer-review

Abstract

The Job Shop Scheduling Problem (JSSP) is work allocation on workstations to produce items that have a goal to optimize a few objectives. This research aims to develop the JSSP's model that deals with machines and job sequences by dual objective functions under the new gainful constraints involving types of skilled workers according to the case study of a steel mill. The proposed methodology of this research is applied with the Memetic algorithm (Genetic algorithm and Local Search technique) and the Pareto optimization. The result generated from the proposed idea can help the manager to decide on the assignment of the right worker to operate the right machine with the right job to achieve the objective values of minimum makespan and maximum average utilization of workers.

Original languageEnglish
Title of host publication2021 IEEE International Conference on Industrial Engineering and Engineering Management, IEEM 2021
PublisherInstitute of Electrical and Electronics Engineers Inc.
Pages1203-1207
Number of pages5
ISBN (Electronic)9781665437714
DOIs
Publication statusPublished - 2021
Event2021 IEEE International Conference on Industrial Engineering and Engineering Management, IEEM 2021 - Virtual, Online, Singapore
Duration: 13 Dec 2021 → 16 Dec 2021

Publication series

Name2021 IEEE International Conference on Industrial Engineering and Engineering Management, IEEM 2021

Conference

Conference2021 IEEE International Conference on Industrial Engineering and Engineering Management, IEEM 2021
Country/TerritorySingapore
CityVirtual, Online
Period13/12/21 → 16/12/21

Keywords

  • Average utilization of workers
  • Job shop scheduling problem
  • Makespan
  • Memetic algorithm
  • Skilled workers

Fingerprint

Dive into the research topics of 'Dual-objective Job Shop Scheduling Problem with Skilled Workers'. Together they form a unique fingerprint.

Cite this