Skip to main navigation Skip to search Skip to main content

Consumer Product Repetitive Production Planning with Color Sequence Wheel to Reduce Total Changeover Time

  • Mahidol University

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

1 Citation (Scopus)

Abstract

In manufacturing, every minute a process is stopped to carry out changeover is one less minute of productive time. Therefore, reducing changeover time is a golden opportunity to unlock more productive time. Changeover time reduction increases operational efficiency for production and reduces waste. This research aims to improve production planning by applying the sequence wheel method to repetitive production. The focus is to find a new pattern by writing an algorithm in Visual Basic for Applications (VBA) on Microsoft Excel and propose a standard changeover color sequence wheel. In the analysis, two production conditions were set. First, loading process time was calculation only for the first job, loading times of the following processes were omitted. Second, the mixing process time was not included if two consecutive jobs with the same color were produced. This process consisted of eight jobs, and each work had eight steps. The analysis results found that a new pattern with two proposed conditions could reduce total changeover time by 22.22 percent, and the sequence should start from light to dark color with package sizes consideration.

Original languageEnglish
Title of host publication2021 IEEE International Conference on Industrial Engineering and Engineering Management, IEEM 2021
PublisherInstitute of Electrical and Electronics Engineers Inc.
Pages801-807
Number of pages7
ISBN (Electronic)9781665437714
DOIs
Publication statusPublished - 2021
Event2021 IEEE International Conference on Industrial Engineering and Engineering Management, IEEM 2021 - Virtual, Online, Singapore
Duration: 13 Dec 202116 Dec 2021

Publication series

Name2021 IEEE International Conference on Industrial Engineering and Engineering Management, IEEM 2021

Conference

Conference2021 IEEE International Conference on Industrial Engineering and Engineering Management, IEEM 2021
Country/TerritorySingapore
CityVirtual, Online
Period13/12/2116/12/21

UN SDGs

This output contributes to the following UN Sustainable Development Goals (SDGs)

  1. SDG 9 - Industry, Innovation, and Infrastructure
    SDG 9 Industry, Innovation, and Infrastructure

Keywords

  • Production planning
  • Repetitive production
  • Sequence wheel method
  • Total changeover time
  • VBA

Fingerprint

Dive into the research topics of 'Consumer Product Repetitive Production Planning with Color Sequence Wheel to Reduce Total Changeover Time'. Together they form a unique fingerprint.

Cite this