N2 - This research aims to identify, investigate, rank, and mitigate delay factors perceived to affect private financed residential building construction project in Phnom Penh city, Cambodia in order to recommend actions of how to deal with such delays. To identify and rank delay factors, a questionnaire survey that matches the research preference was conducted. The first round of data collection showed the delay factors ranking through the Relative Importance Index (RII) method. The top ten (10) most critical delay factors were mitigated in the second round of data collection with recommended actions proposed by experts using the Delphi Technique and the Failure Mode and Effect Analysis (FMEA) method. The study results revealed the critical delay factors and their possible solutions. The list of delays affecting private financed building construction project in Cambodia was mainly dominated by the factors related to labor and material.
AB - This research aims to identify, investigate, rank, and mitigate delay factors perceived to affect private financed residential building construction project in Phnom Penh city, Cambodia in order to recommend actions of how to deal with such delays. To identify and rank delay factors, a questionnaire survey that matches the research preference was conducted. The first round of data collection showed the delay factors ranking through the Relative Importance Index (RII) method. The top ten (10) most critical delay factors were mitigated in the second round of data collection with recommended actions proposed by experts using the Delphi Technique and the Failure Mode and Effect Analysis (FMEA) method. The study results revealed the critical delay factors and their possible solutions. The list of delays affecting private financed building construction project in Cambodia was mainly dominated by the factors related to labor and material.
KW - Additional Keywords and Phrases: Construction
KW - Cambodia
KW - Delay
KW - FMEA
KW - Relative Importance Index
UR - https://www.scopus.com/pages/publications/85117401853
U2 - 10.1145/3473141.3473247
DO - 10.1145/3473141.3473247
M3 - Conference contribution
AN - SCOPUS:85117401853
T3 - ACM International Conference Proceeding Series
SP - 187
EP - 194
BT - ICFET 2021 - Proceedings of 2021 7th International Conference on Frontiers of Educational Technologies
PB - Association for Computing Machinery
T2 - 7th International Conference on Frontiers of Educational Technologies, ICFET 2021
Y2 - 4 June 2021 through 7 June 2021
ER -